INDOOR SOLUTIONS

Objective:

UMTS OPTIMIZATION for one of the leading operators and included a coaxial solution combining 7/8″ feeders for the backbone and 1/2″ feeders for the floors. Project site: Toyota Building in the center of Tel Aviv, Israel Building specifications: Set in the bustling commercial center of Tel-Aviv. The south building is 93.9m height with 20 floors while the north building has 4 floors.The total area of both buildings is 36,000sqm.The buildings share 4 floors that are undergroundserving both as foundations and for parking. The main elements installed to create the DAS environment are:

Antennas- 105 (Omni and Panels)
Feeder cables – 2934m (1/2″) and 780m (7/8″)
Distribution Units – 63 (splitters and combiners)
Radio equipment – Ericsson RBS 3418+ 10W repeater
Power supply unit – 2 power cabinets +battery set

In-Building

Coverage for the El Cubo Building Objective: Coverage and capacity improvement for 2 Operators in Peru plus a coaxial solution combining 7/8″ feeders for the backbone and 1/2″ feeders for the floors. Project site: El Cubo Building Lima, Peru Building specifications: The total area of the building is 29,250 sqm., The building has 15 floors of which 9 are used as offices and 6 parking. The main elements installed to create the DAS environment are:

Antennas- 60 (Omni and Panels)
Feeder cables – 1000m (1/2″) and 500m (7/8″)
Distribution Units – 52 (Splitters and combiners)
Power supply unit – 2 power cabinets +battery set
1st Operator Radio equipment – Nokia Siemens Network Flexi multi Radio 2G+3G+LTE+5G
2nd Operator Radio Equipment –Huawei Networks Node B